Env Planning Review |
|
1. Provide a detailed "Site Plan" of the shopping center and the location of the building to be renovated. 2. Provide a "Soils Report Update Letter" from the project geotechnical engineer that addresses the proposed project. 3. Provide a grading/drainage plan completed by a licensed civil engineer for review. 4. After the items above have been addressed, please submit an original signed/stamped "Plan Review Letter" from the project geotechnical engineer. Please make sure the engineer reviews all pertinent plan sheets with the latest revision dates. |