1. Please complete and return two copies of a special inspection and testing agreement form for the special inspections listed on Sheet S1.1. This form and a list of approved special inspection agencies are available under "forms" at http://www.sccoplanning.com/PlanningHome/BuildingSafety.aspx . [CBC 1704]
2. The architectural plans were not signed. Please provide signatures of CA licensed designer(s) on all sheets. . [§5536.1, 6735 California Business and Profession Code]
3. This project is subject to the 2016 CBC. Please provide an addendum from the geotechnical engineer, as the report is based on the 2010 CBC.
4. Please provide a plan review letter or review form from the geotechnical engineer of record confirming that the proposed plans are in general conformance with the recommendations of the soils report. The review form is located at http://www.sccoplanning.com/PlanningHome/Environmental/GeologyandSoils.aspx .
5. Please remove Building B from this plan set, as Building B is under permit application B-173461.
6. Please revise the construction waste notes on A0.1 and GB1 to specify 65% of construction waste to be recycled, salvaged or reused. [CALGreen 5.408.1]
7. The allowable area calculations on A0 assumes separate buildings, which requires fire walls. Please verify the existence of fire walls between buildings that adjoin each other. Revise the area calculations if fire walls do not exist, and revise types of construction and details accordingly. [CBC 706]
8. Please include total areas of new or replaced structures on the title sheet. Include new or replaced for all buildings and tower at Building A.
9. Please clarify if a site wall is to be part of this permit application or if it will be under a separate permit. If it is part of this permit, please submit the plans and calculations in the next submittal, as indicated on Sheet C2.4.
10. There is an existing ramp from the sidewalk leading to Building K. Sheet SW1.1 shows a path of travel along this ramp. This ramp does not meet current accessibility requirements. Please provide plans to show how this will be rectified. The minimum length of landings in the direction of ramp runs is 72". It also appears the bottom rail or wheel guide (curb) is not provided [CBC 11B-405.7.4]
11. Please include complete dimensions for accessible parking, ramps, curbs, access ways, etc. or reference to details on A0.3 from the civil plans. Details that do not correspond to site conditions will need to be separately detailed with dimensions.
12. Please include manufacturer’s specifications for the lifts to verify compliance with CBC 11B-410.
13. Please complete the reference to detail on keynote 503 on Sheet A1.0. Provide the design and detail. The rail shall be capable of resisting a 50 lb. linear per ft. load and a 200 lb. concentrated load per ASCE 7-10, 4.5.1. [CBC 1607.8.1]
14. The roof plan on Sheet A1.0 references 71/A7.5 for both the roof drain and overflow. Only the roof drain is detailed in 71/A7.5. Please include specifications and/or detail for the overflow drain.
15. Title 24 sheets SE4, E4A, and E3P are not legible in BlueBeam Review. Please provide program compatible sheets.
16. Please include roof and wall insulation R-values and insulation types. Include specifications for roof assemblies to verify if vented or unvented condtions are proposed. [CBC 1203.3]
17. Please clarify if new ventilation systems will be installed under this permit. The energy compliance documents on TM2A, and TM2D include ventilation system designs. Include mechanical plans for these systems, as applicable.
Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. Have changes made to the plans not resulting from this correction list?
Please check ____________Yes ______________No
If Yes, please describe the changes and where they are located in the plans:
Note: For the referenced code information, go to http://www.bsc.ca.gov/Codes.aspx and/or http://www.sccoplanning.com/PlanningHome/BuildingSafety/BuildingCodes.aspx .
For eplan resubmittal requirements, please see http://www.sccoplanning.com/PlanningHome/BuildingSafety/ePlanReview.aspx