Building Review

Review No:1

The meter and supply branches shall be sized to accommodate anticipated demand loads. Please specify the size of the water meter on the plans. [CPC 610]


***********************************************************************************


Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. Have changes made to the plans not resulting from this correction list?


Please check ____________Yes ______________No


If Yes, please describe the changes and where they are located in the plans:


Note: For the referenced code information, go to http://www.bsc.ca.gov/Codes.aspx and/or http://www.sccoplanning.com/PlanningHome/BuildingSafety/BuildingCodes.aspx .


For eplan resubmittal requirements, please see http://www.sccoplanning.com/PlanningHome/BuildingSafety/ePlanReview.aspx


Please be advised that if plan check comments are required to be addressed leading to a 3rd plan check, additional charges will be added to your permit fee at an hourly rate.


If you have any questions regarding these building plan check comments, please contact Laura Mellish(Brinson) at 831-454-3151 or email laura.brinson@santacruzcounty.us.