Building Review

Review No:1

1. Please clarify the type and number of bolted connections for the logo sign, letters and attribute wall sign. For the logo and letters, the structural calculations use 4 bolts each, 3/8"x 16 SS bolts. For the attribute wall sign, the structural calculations use 2 rows of 8 bolts, 3/8"-16 6061-T6 aluminum bolts.



2. Please submit energy compliance documents for sign lighting and corresponding controls. Include requirements on the drawings. [CA Energy Std. 130.3, 140.8]

 

3.  Please locate the canopy sign such that it does not hang over a walkway without having a minimum headroom clearance of 6'8" (80 inches).  [CBC 11B-307.4]


 


Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. Have changes made to the plans not resulting from this correction list?


Please check ____________Yes ______________No


If Yes, please describe the changes and where they are located in the plans:


Note: For the referenced code information, go to http://www.bsc.ca.gov/Codes.aspx and/or http://www.sccoplanning.com/PlanningHome/BuildingSafety/BuildingCodes.aspx .


For eplan resubmittal requirements, please see http://www.sccoplanning.com/PlanningHome/BuildingSafety/ePlanReview.aspx


Please be advised that if plan check comments are required to be addressed leading to a 3rd plan check, additional charges will be added to your permit fee at an hourly rate.


If you have any questions regarding these building plan check comments, please contact Laura Mellish at 831-454-3151 or email laura.mellish@santacruzcounty.us