Review No:1
Agency Plan Check #: B-195681 |
Job Address: 1 Seascape Resort Dr, Aptos |
Job Description: Tenant improvement – add counter sales area to hotel lobby |
Steve May |
CSG Consultants |
Phone: 209-862-9511 |
PLAN CHECK COMMENTS
1. Sheet A1.0: Under "Green Building Notes", 3, revise the text "City of Capitola" to reference the appropriate authority having jurisdiction.
Response: _________________________________________________________________________________________
2. Sheet A2.1: Provide signed and sealed structural plans, details and calculations for the new openings in the existing exterior walls.
Response: _________________________________________________________________________________________
3. Sheet A2.2: Provide plumbing plans for the proposed alterations. Provide a DWV plan. Provide a supply line plan.
Response: _________________________________________________________________________________________
4. Sheet A5.1: Under "Door Schedule Notes", 1, add the following requirement:
• The lever of lever actuated latches shall be curved with a return to within ½ inch of the door to prevent catching on the clothing of persons during egress.
Response: _________________________________________________________________________________________
5. Sheet A5.1: Under "Door Schedule Notes", add a note specifying the following requirement:
• Door closers shall be adjusted so that from an open position of 90 degrees, the time required to move the door to a position of 12 degrees from the latch is 5 seconds minimum.
Response: _________________________________________________________________________________________
6. Sheet A9.0: Under "Electrical Notes", 9, the quoted Code requirement applies to residential projects. Delete the note.
Response: _________________________________________________________________________________________ 3
7. Sheet A9.0: Under "Electrical Notes", 13, the note is not correct. All nonresidential outdoor lighting shall be controlled by a photocontrol device or an outdoor astronomical time switch capable of automatically shutting OFF the outdoor lighting when daylight is available.
Response: _________________________________________________________________________________________
8. Sheet A9.0: Under "Electrical Notes", 15, the note does not comply with the 2016 Energy Code nonresidential lighting requirements.
Response: _________________________________________________________________________________________
9. Sheet A9.0: Under "Electrical Notes", 20, revise the edition of the Codes to read "2016".
Response: _________________________________________________________________________________________
10. Sheet A9.0: Under "RCP Notes", 9, the quoted Code requirement applies to residential projects. Delete the note.
Response: _________________________________________________________________________________________
11. Sheet A9.0: Under "RCP Notes", 13, the note is not correct. All nonresidential outdoor lighting shall be controlled by a photocontrol device or an outdoor astronomical time switch capable of automatically shutting OFF the outdoor lighting when daylight is available.
Response: _________________________________________________________________________________________
12. Sheet A9.0: Under "RCP Notes", 15, the note does not comply with the 2016 Energy Code nonresidential lighting requirements.
Response: _________________________________________________________________________________________
13. Sheet A9.0: Under "RCP Notes", 20, revise the edition of the Codes to read "2016".
Response: _________________________________________________________________________________________
14. Sheet A9.0: All installed indoor lighting shall be controlled with an occupant sensing control, automatic time-switch control, signal from another building system, or other control capable of automatically shutting off all lighting when the space is typically unoccupied.
Response: _________________________________________________________________________________________
15. Sheet A9.0: Provide complete panel schedules for altered electrical panels. Provide electrical load calculations for the altered panels.
Response: _________________________________________________________________________________________
16. Sheet A9.0: At the Reflected Ceiling Plan, provide details and specifications for dropped gypsum board ceiling. Specify the ceiling joist members, their connection to the supporting members, and the connection of the supporting members to the bearing walls and roof assembly.
Response: _________________________________________________________________________________________
(End of Comments)
Building Review Only
|