Review No:11. Please provide structural analysis and framing plans for the support of added mechanical units
on the roof and new location for the roof hatch.
2. Please include structural specifications for remodeled bearing walls to include wall framing and
header requirements.
3. Please include manufacturer’s installation requirements for condensers mounted on the roof.
4. Please include accessibility details for clearances at hand sinks at the sundae counter and prep
area. CBC 11B- 212.3
5. Please include energy compliance documents for the altered envelope for altered exterior walls.
Include specifications in the plan notes and details to correspond. 2019 CA Energy Standards
141(b)
Have changes made to the plans not resulting from this correction list?
Please check ____________Yes ______________No
If Yes, please describe the changes and where they are located in the plans:
Note: For the referenced code information, go to http://www.bsc.ca.gov/Codes.aspx and/or
http://www.sccoplanning.com/PlanningHome/BuildingSafety/BuildingCodes.aspx .
For eplan resubmittal requirements, please see
http://www.sccoplanning.com/PlanningHome/BuildingSafety/ePlanReview.aspx
Please be advised that if plan check comments are required to be addressed leading to a 3rd
plan check, additional charges will be added to your permit fee at an hourly rate.
If you have any questions regarding these building plan check comments, please contact
Laura Mellish at laura.mellish@santacruzcounty.us
|