Building Review

Review No:1
Architectural
1. Please add photovoltaic systems to the list of deferred submittals on Sheet A001.
2. The energy compliance documents list HERS certification requirements in the HERS Feature Summary on the CF1R forms. Please note HERS certification required on the cover sheet of the drawings. CA Administrative Code 10-103(a)
3. Please revise the limits of work plan A004 to include this permit. 4. Please locate and specify a minimum 36” detectable warning strips at the walkways from the sidewalk where it adjoins the parking lot and/or driveway area. [CBC 11B-247.1.2.5]
5. Please include accessible parking space signage callouts on the site plans. If the sign is in a walkway, the lowest bottom edge shall be 80” minimum above the sidewalk. Detail 12/C7 does not show 80” elevation at the lowest sign. CBC 11B-502.6
6. All ground floor units shall be adaptable. A minimum of 10 percent but not less than one of the ground floor multi-story residential dwelling units are required to comply with the adaptable accessible elements. The multi-story unit requirement shall be calculated using the total number of multi-story residential dwelling units in buildings on a site.
It appears all ground floors are intended to be adaptable. However, please provide corresponding details and specifications to show compliance in kitchens and baths for the lower floor areas that will be adaptable and comply with CBC 11A, Division IV-Dwelling Unit features. Clearances appear to be met, but specifications and details are needed for removable base cabinets under sinks, fixture mounting details, grab bar reinforcing, and bathtub controls.
7. Please include accessible features for units required to have mobility features in CBC 11B-809.2 through 11B-809.4. These features include bathroom fixture requirements, flush control locations, and clearances per CBC 11B-603 through CBC 11B-610. CBC 11B-233.3.1.1
Note: Vanity countertops may not be reduced in size compared to other units. Advisory 11B-809.4 in DSA manual from USDOJ: Toilet facilities and bathing facilities. In an effort to promote space efficiency, vanity countertop space in accessible residential dwelling units is often omitted. This omission does not promote equal access or equal enjoyment of the unit. Where comparable units have vanity counter tops, accessible units should also have vanity counter tops located as close as possible to the lavatory for convenient access to toiletries.
8. For Unit types B and B1, please show that a minimum 48” long landing is provided for the entire entry door widths and that the columns do not encroach into this clear space. If the doors have a closer and latch, an additional 12” is required past the strike side. This may be shown on the individual floor plans for first floors. CBC 1126A.3.1
9. Please revise keynote 19 that is directed at the kitchen sink in the community room on sheet A227, as the note does not correspond.
10. Please dimension minimum 60” between the kitchen peninsula island and the sink cabinets and the community kitchen. CBC 11B-804.2.2
11. Stairs other than those serving individual units need to comply with the striping requirements in CBC 11B-504.4.1. Please include the striping requirements on the stair details.
12. Please revise the swing direction of door D2 leading out to the deck on the ground floor units B and B1 or revise the cabinetry such that minimum 18” strike side clearance is provided. CBC 1132A.5.2
13. Please include insulation types and R-values in cross-section notes that correspond with the energy compliance documents.
14. Please include an ICC ESR Report for the Hansen railing system, or provide structural calculations and installation manual. Any welding that will reduce design forces that is not performed by a verified and approved fabricator will require special inspection.
Civil
15. Please locate and specify a minimum 36” detectable warning strips at the walkways from the sidewalk where it adjoins the parking lot and/or driveway area. [CBC 11B-247.1.2.5]
Structural
16. Please revise the deferred submittals note on Sheet S1.1 to refer to Santa Cruz County, rather than City of Watsonville.
17. Structural calculations indicate Simpson HD holdowns to be used. Sheet S1.1 includes Simpson ATS system is noted as a deferred submittal. There are Earthbound tiedown plans submitted. Please coordinate the plans and structural calculations.
18. The PT slab calculations for the Adapt Software state the design is based on UBC-1997. Please provide a clarification and/or revised calculations that are based on current code and standards.
19. Please submit Santa Cruz County’s Special Inspection Form PLG-240 and include it in the supplement file. This form should correspond with the one shown on Sheet S1.2, or revise S1.2 to include the Santa Cruz County form. This form and a list of approved special inspection agencies is available under “forms” at http://www.sccoplanning.com/PlanningHome/BuildingSafety.aspx . [CBC 1704]
20. Please refer to the shear wall schedule 5/S8.2 in plan notes where shear wall marks occur.
21. Please include shear wall type HF in the shear wall schedule 5/S8.2. Include references to the applicable Hardyframe details from this schedule.
22. Please include steel column to beam connection details and specifications at the exterior stairwells framing.
23. Detail 14/S8.3 is an awning detail, but does not appear to be identified correctly from the plans. For example, third floor framing plan Sheet 2S203 shows this detail at the lower roof cover over the patio storage area. Please clarify if and where this detail may apply.
Plumbing
24. The plumbing plans need to be signed by the responsible engineer.
25. Please specify materials to fill annular spaces of plumbing penetrations at horizontal floor ceiling and vertical wall fire-resistive assemblies shall be tested per ASTM E119 or UL 263. This information may be on Sheet P601 where a wall assembly detail is provided. The same applies to horizontal assemblies. CBC 714.4 and 714.5
Mechanical
26. The mechanical plans need to be signed by the responsible engineer.
27. Please locate and identify the Indoor Air Quality (IAQ) systems to be used for each building on the mechanical plans. Coordinate requirements with the energy compliance documents.
Electrical
28. The electrical plans need to be signed by the responsible engineer.
29. Please include kitchens and laundry rooms in the AFCI note M under Residential Wiring Notes on Sheet E0.1. CEC 210.12
30. The declaration statement of the NRCC-LTI-E and NRCC-LTO-E forms shown on Sheets E0.2 and E0.3 need to be signed by the documentation author and the designer. CA Energy §10-103(a)1.A.vi
31. Please include an outdoor lighting plan to include lighting fixtures XA, which are denoted as wall sconces on Sheet E0.1. Coordinate the outdoor lighting plans and the lighting tags on the outdoor lighting forms for energy compliance such that the lighting forms may be verified. Lighting forms indicate 28 type XA fixtures.
32. Please include plans for outdoor parking lot lighting. Include this lighting in the energy compliance forms.
33. It appears there are more XD lighting fixtures shown on the plans than the 31 in the energy compliance documents. A count of 44 type XD fixtures was made from the plans provided.
34. Please revise form CF2R-LTG-02-E to include “N” at Section A09, as there are no garages proposed, and register this form with the HERS provider.
Energy
35. The areas used in the energy compliance documents on Sheets T24 f do not correspond with the areas shown on Sheet A101. Please coordinate the conditioned floor areas.
Have changes made to the plans not resulting from this correction list? Please check ____________Yes ______________No If Yes, please describe the changes and where they are located in the plans:
Note: For the referenced code information, go to http://www.bsc.ca.gov/Codes.aspx and/or http://www.sccoplanning.com/PlanningHome/BuildingSafety/BuildingCodes.aspx . For eplan resubmittal requirements, please see http://www.sccoplanning.com/PlanningHome/BuildingSafety/ePlanReview.aspx Please be advised that if plan check comments are required to be addressed leading to a 3rd plan check, additional charges will be added to your permit fee at an hourly rate.
If you have any questions regarding these building plan check comments, please contact Laura Mellish at laura.mellish@santacruzcounty.us
Review No:2
1. A curb ramp is required at the north-west corner where the walkway connects to the pedestrian way crossing the drive aisle. Please include a curb ramp detail at this area. CBC 11B-206.2.2, 250, 406
2. Please provide curb ramp details corresponding to the types called out on Sheet C3.0. Include dimensions, curb ramp slopes, detectable warning strip sizes, etc. CBC 11B-406
3. The stove/range encroaches into the door clearance area of 1’6” beyond the strike edge and 44” deep maneuvering clearance area for unit types B, B2 and B3. Please revise the plans. CBC 1132A.5
4. Please correct the insulation mark for walls on the section shown on A702. This was mismarked with a ceiling insulation specification.
5. Please correct insulation between units on the cross-sections to correspond with detail 7/A800, or refer to this detail from the cross-sections.
6. Please include the original structural calculations, in addition to the addendum. Complete SUP and PLN files are required for permit issuance.
7. Please key from foundation plans to identify holdown requirements, based on the tension and compression loads and framing conditions.
8. The number of exterior light types XC is shown as 5 on Sheet E2.1. The energy compliance documents indicate 3 total. Please revise the form NRCC-LTO-E to correspond.
Have changes made to the plans not resulting from this correction list? Please check ____________Yes ______________No
If Yes, please describe the changes and where they are located in the plans:
Note: For the referenced code information, go to http://www.bsc.ca.gov/Codes.aspx and/or http://www.sccoplanning.com/PlanningHome/BuildingSafety/BuildingCodes.aspx . For eplan resubmittal requirements, please see http://www.sccoplanning.com/PlanningHome/BuildingSafety/ePlanReview.aspx Please be advised that if plan check comments are required to be addressed leading to a 3rd plan check, additional charges will be added to your permit fee at an hourly rate.
If you have any questions regarding these building plan check comments, please contact Laura Mellish at laura.mellish@santacruzcounty.us
Review No:3
The previous plan check comments are copied below. The latest corrections are below the responses in bold print.
1) 3: The stove/range encroaches into the door clearance area of 1’- 6” beyond the strike edge and 44” deep maneuvering clearance area for unit types B, B2 and B3. Please revise the plans. CBC 1132A.5
RESPONSE 3: CBC 1132A.5 does not specifically prohibit clear spaces from overlapping, nor does CBC 1126A.3.1. Per the CBC and the FHA Design Manual clear spaces are allowed to overlap in bathrooms and kitchens.
The correction to comply with CBC 1132A.5 remains. The CBC and FHA Design Manual do state areas where clear spaces may overlap. The stove is not a clear space. The stove encroaching into a clear space for maneuvering at the doors is not permitted.
2) 6: Please include the original structural calculations, in addition to the addendum. Complete SUP and PLN files are required for permit issuance.
RESPONSE 6: The original structural calculations in addition to the addendum structural calculations are included within this submittal.
The original structural calculations were not included in the supplement file. Please resubmit.
3) 7: Please key from foundation plans to identify holdown requirements, based on the tension and compression loads and framing conditions.
RESPONSE 7: The required tie-down types were previously provided on sheets S8.7 to S8.16. The tension and compression forces were previously provided on the foundation plans on sheets 1S201, 2S201, 3S201A, 3S201B, 4S201A, and 4S201B.
Forces are provided in the structural sheets as stated in the response. However, a key from these sheets to identify the model numbers and configurations shown in S8.1 through S8.16 are needed for construction and inspection purposes.
Note: A July 1, 2021 supplement for accessibility includes curb ramp specifications related to detectable warnings and added lengths beyond the detectable warnings. This project was submitted for a building permit application prior to the effective date of this supplement, so it is not required that plans be revised to comply with the current supplement. However, this is something to consider. See current CBC 705.1.2.2.2
Have changes made to the plans not resulting from this correction list? Please check ____________Yes ______________No
If Yes, please describe the changes and where they are located in the plans:
Note: For the referenced code information, go to http://www.bsc.ca.gov/Codes.aspx and/or http://www.sccoplanning.com/PlanningHome/BuildingSafety/BuildingCodes.aspx . For eplan resubmittal requirements, please see http://www.sccoplanning.com/PlanningHome/BuildingSafety/ePlanReview.aspx Please be advised that if plan check comments are required to be addressed leading to a 3rd plan check, additional charges will be added to your permit fee at an hourly rate.
If you have any questions regarding these building plan check comments, please contact Laura Mellish at 831-454-3151 or email laura.mellish@santacruzcounty.us