Review No:11. Per California Building Code 11B-202.4, alterations to existing commercial spaces trigger accessibility improvements based on adjusted construction cost of the project. Please complete and return a cost documentation form at http://www.sccoplanning.com/PlanningHome/BuildingSafety/Accessibility.aspx . Please revise the plans to show required upgrades for accessible features if any of the current features listed in the form do not comply. The accessibility work does not need to exceed 20% of the adjusted construction costs to put in the pedestal sinks. The CBC definition of adjusted construction cost is: All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and construction management costs. The costs shall not be reduced by the value of components, assemblies, building equipment or construction not directly associated with accessibility or usability. The adjusted construction cost shall not include: project management fees and expenses, architectural and engineering fees, testing and inspection fees, and utility connection or service district fees. Received after permit was issued and finalled 2. At least one of the hand sinks need to be detailed to comply with CBC 1B-212.3 for clearances and mounting heights. Permit inspection did not note hand sink was out of compliance with CBC 11B-212.3 See the following notice, which is required to be provided by all jurisdictions to applicants for commercial permits: Notice to Applicants for Commercial Building Permits (sccoplanning.com) Have changes made to the plans not resulting from this correction list? Please check ____________Yes ______________No If Yes, please describe the changes and where they are located in the plans: Note: For the referenced code information, go to http://www.bsc.ca.gov/Codes.aspx and/or http://www.sccoplanning.com/PlanningHome/BuildingSafety/BuildingCodes.aspx . For eplan resubmittal requirements, please see http://www.sccoplanning.com/PlanningHome/BuildingSafety/ePlanReview.aspx Please be advised that if plan check comments are required to be addressed leading to a 3rd plan check, additional charges will be added to your permit fee at an hourly rate. If you have any questions regarding these building plan check comments, please contact Laura Mellish at laura.mellish@santacruzcounty.us
|