Review No:11. The on-demand water heaters increase the gas demand significantly. Please provide a gas
line schematic that indicates BTU values of all existing and proposed gas appliances, the
developed length from the meter to each appliance outlet, the minimum pipe size and the
proposed gas pipe material. CPC 1216.0 and Table 1216.2(1)
Have changes made to the plans not resulting from this correction list?
Please check ____________Yes ______________No
If Yes, please describe the changes and where they are located in the plans:
Note: For the referenced code information, go to http://www.bsc.ca.gov/Codes.aspx and/or
http://www.sccoplanning.com/PlanningHome/BuildingSafety/BuildingCodes.aspx .
For eplan resubmittal requirements, please see
http://www.sccoplanning.com/PlanningHome/BuildingSafety/ePlanReview.aspx
Please be advised that if plan check comments are required to be addressed leading to a 3rd
plan check, additional charges will be added to your permit fee at an hourly rate.
If you have any questions regarding these building plan check comments, please contact
Laura Mellish at laura.mellish@santacruzcounty.us
|