Review No:1Responses must include an annotated copy of these comments and indicate the specific sheet/drawing
numbers where revisions are located. Text can be copied from the Application Status webpage and
pasted into a text editing program.
Please Respond: Have changes been made in addition to those resulting from the Building Review
Comments? ___________ (Yes or No). If yes, please briefly describe the additional changes and the
location on the plans/documents:
Architectural
1. Please add duct sizing in the deferred submittals lists, along with heating and cooling system
on the cover sheet.
2. Air conditioning units are shown to be set away from the house, with refrigerant lines
running under the driveway. Please provide manufacturer’s listed specifications for the
installation requirements for these units to allow this.
3. Please dimension the deck area on the second-floor plan, Sheet A2. Coordinate the
dimensions with the deck joist spans designed in the structural calculations.
4. Ramps serving the egress door required by Section R311.2 shall have a slope of not more
than 1 unit vertical in 12 units horizontal (8.3- percent slope). Other ramps shall have a
maximum slope of 1 unit vertical in 8 units horizontal (12.5 percent). Handrails shall be
provided on not less than one side of ramps exceeding a slope of one unit vertical in 12 units
horizontal (8.33-percent slope). Please provide ramp specifications and details for the ramp
shown at the entrance door. Include ramp materials. For concrete, show how clearance to
wood will be provided or indicate preservative treated wood. CRC R311.8, CRC R317.1,
item 5
5. Please specify the elevator manufacturer and model on the plans and submit product
installation requirements. Private residence elevators shall comply with ASME A17.1/CSA
B44. The manufacturer’s drawings need to show the complete layout for the elevator,
machine room, equipment, electrical, service access requirements, clearances, pit/overhead
requirements, and required venting, as applicable to the approved listing. CRC R321.1
6. Please specify site built or pre-fabricated spiral stairs. Include specifications and details to
verify compliance with CRC R311.7.10.1. If welded components are part of the spiral stairs,
special inspection is required, unless approved fabricator certification is submitted. Pre-fabricated stairs may be listed as a deferred submittal on the cover sheet of the drawings
CBC 1704.2.5
7. The garage floor plan shows steps at the sink/counter area. These steps do not appear to be
serving any area. Please clarify with details and specifications and/or delete these steps.
8. Please identify the Viewrail guard system on the plans and key to the manufacturer’s listed
specifications.
9. Please callout the fireplace unit manufacturer and model on the plans, or key to the
specification to locate this information. The specifications will need to include listing
numbers to verify approval. Typical listing agencies are Intertek, Warnock Hersey, UL, and
ICC ESR.
10. Please callout the sauna manufacturer and model on the plans, or key to the specification to
locate this information. The specifications will need to include listing numbers to verify
approval. Typical listing agencies are Intertek, Warnock Hersey, UL, and ICC ESR.
11. Please include damproofing specifications for concrete foundation walls enclosing
interior spaces and/or key to the specification number in the supplement
documents. CRC R406.1
12. Please callout the decking material on the plans to correspond with the specifications, or
key to the specification to locate this information.
13. Enclosed framing in exterior balconies and elevated walking surfaces that are
exposed to rain or irrigation shall be cross-ventilated with openings providing
minimum 1/150 of the area of each enclosed space. Please detail decks to comply.
CRC R317.1.6
14. Please include details and specifications (and/or key to specifications) for porches and
soffits and venting or an unvented condition. Unvented assemblies shall be in
accordance with CRC R806.5 or CBC 1203.3.
15. Please key to the specifications for roof installation and materials from the roof plan.
16. Please revise specification 14B header to refer to the 2019 California Green Building Code,
rather than the 2016.
17. Please revise specification 14B D to specify maximum flow rate for showerheads to be 1.8
gpm, rather than 2.0 gpm. CALGreen 4.303
18. In the Green Building notes on Sheet A.17, please note a minimum of 65% of the
construction and demolition waste shall be recycled, reused on the project, or salvaged for
later use or sale. CALGreen 4.408.1
19. Please include insulation types and R-values in the cross-section details to correspond with
the energy compliance documents. R-38 is required in ceilings, R-23 in minimum 2x6 walls,
R-7.5 in 1.5 inch furring at concrete walls, and R-19 in minimum 2x10 floor joists to separate
conditioned and unconditioned areas.
Electrical
20. Please delete the pool heater from the plans on Sheet E.1, or note that it is not part of this
permit.
21. Please include the required electrical setup for future EV charging on the electrical plans.
Locate a listed cabinet, box or other enclosure to provide for a future electric vehicle charge
with “EV CAPABLE” marking. A listed raceway to accommodate a 208/240-volt branch
circuit to this area shall be provided. The electrical panel overcurrent device for the future
charger shall be identified as “EV CAPABLE”. CALGreen 4.106.4.1
22. Please coordinate the electrical legend with the plans. For example, the plans have light
fixtures with adjacent letters, but these letters are not in the legend and/or schedule. Sheet
E.1 has a note “See E.2 for Light Fixture Schedule”, but there is no schedule on Sheet E.2.
23. Providing “DIM” in the schedule seems like this should be on the plans at applicable areas.
Although not ideal, notes may substitute for required lighting control, including dimmers.
However, if notes are used instead marking the electrical switches with “DIM”, the “DIM”
should be removed from the schedule so that it is clearer.
24. “OS” is shown in the bathroom 1, 3, and pantry. Vacancy sensors are required to provide
lighting control in these areas, unless occupancy sensors are noted to be manual
on/automatic off. Also, other areas such as the master bath, laundry, garage, and
mechanical room do not have any lighting control marks on the plans. Please provide
consistency. Either show all rooms with vacancy sensor symbols or manual on/auto off
occupancy sensors, or delete all the symbols and include the requirements in the notes for
energy compliance. CA Energy §150.0(k)2I
25. “GFI” is marked in every required area except bath 1, bath 2 and the kitchen. Please add
this mark in these areas to be consistent. CEC 210.8(A)
26. Please delete or revise note 6 on Sheet E.1. Maximum flow rate for showerheads is 1.8
gpm, rather than 2.0 gpm. CALGreen 4.303
Plumbing
27. Based on the total Btu demand, the gas pipe sizing shown on Sheet P1 is undersized. Using
CPC Table 1215.2(27), minimum main branch will need to be 1 1/4”. Please revise the gas
pipe sizing diagram.
28. Please specify minimum 4” waste drain to serve 4 or more water closets. [CPC Table
703.2]
29. Please correct the bookmarks such that the designated floor levels match the plan
sheets.
Mechanical
30. Please delete the pool heater from the plans on Sheet E.1, or note that it is not part of this
permit.
31. Please clearly identify areas on the lower level to be conditioned space vs. unconditioned
space. Coordinate the total area with the energy compliance documents.
32. Please include the two central split air conditioning units on the drawings to correspond
with the energy compliance documents. Include manufacturer’s listed specifications.
33. Please locate and identify the whole house ventilation system and method. The energy
compliance documents design an exhaust only method using 116 cfm exhaust fan (one sone
max.). CA Energy Standard 150(o)/ASHRAE Standard 62.2
34. Please correct the bookmarks such that the designated floor levels match the plan
sheets.
Structural
35. Please complete and submit a special inspection form PLG-240. The Statement of
Special Inspection of special inspections on Sheet S1.0 may substitute for the
Statement of Special Inspection portion of the form. This form and a list of approved
special inspection agencies is available under “forms” at
http://www.sccoplanning.com/PlanningHome/BuildingSafety.aspx . [CBC 1704]
36. Stucco is indicated on the architectural elevation plans. Please revise the dead load
tabulation in the structural calculations that currently use Hardy siding. Revise the
corresponding calculations and plans, as necessary.
37. Structural calculations design 1FB4 as a W12x72 beam. Please coordinate the first
floor framing plan with the calculations.
38. Please include steel column to plate connection and bolt embedment specifications on
the foundation details, Sheet S6.0.
39. The Viewrail guard system has an ICC Evaluation Service report, ICC ESR-4798, associated
with it. However, the post connection to the support framing is not included in the
evaluation per the Conditions of Use in section 5.3 of the report. Please provide structural
calculations and details for connections such that a minimum 200 lb. force applied to
the top of the guardrail will be resisted. Include load transfer to framing, which will
include rim board to deck joist load transfer. Provide structural details and
specifications based on these calculations. [CRC R301.5]
40. Please remove red ink from detail 5/S7.0, as read is reserved for reviewer notes.
Civil
41. Please revise the civil plans to include the ramp at the entry door, as shown on the
architectural and structural plans.
For the referenced code information, go to http://www.bsc.ca.gov/Codes.aspx and/or
http://www.sccoplanning.com/PlanningHome/BuildingSafety/BuildingCodes.aspx .
For eplan resubmittal requirements, please see
http://www.sccoplanning.com/PlanningHome/BuildingSafety/ePlanReview.aspx
Please be advised that if plan check comments are required to be addressed leading to a 3rd
plan check, additional charges will be added to your permit fee at an hourly rate.
If you have any questions regarding these building plan check comments, please contact
Laura Mellish at laura.mellish@santacruzcounty.us Review No:2Responses must include an annotated copy of these comments and indicate the specific sheet/drawing
numbers where revisions are located. Text can be copied from the Application Status webpage and
pasted into a text editing program.
Please Respond: Have changes been made in addition to those resulting from the Building Review
Comments? ___________ (Yes or No). If yes, please briefly describe the additional changes and the
location on the plans/documents:
1. Sheet A.2. Deck depth dimension missing. Please add this to the second floor plan.
2. Machine room is not shown on plans per Inclinator Elevette spec sheet 15. Please revise the
plans to locate and identify the elevator machine room.
3. Detail and spec support for spiral stairs. Include deck framing connections. Refer to manuf.
specs in sup documents.
4. Include support framing and anchorage details for the Viewrail guard system. See Item 5.3 in
conditions of use in ECC ESR 4798, stating that this connection is not part of the approved
report. Various options for connections to supports are in the Viewrail specifications. Please
coordinate one of the options with the plans.
5. The Sauna specifications do not include a listing. Please provide the listing. Typical listing
agencies are Intertek, Warnock Hersey, UL, and ICC ESR.
6. Please revise specification 14B header to refer to the 2019 California Green Building
Code, rather than the 2016.
7. Please revise specification 14B D to specify maximum flow rate for showerheads to be
1.8 gpm, rather than 2.0 gpm. CALGreen 4.303
8. In the Green Building notes on Sheet A.17, please note a minimum of 65% of the
construction and demolition waste shall be recycled, reused on the project, or salvaged
for later use or sale. CALGreen 4.408.1
9. Where “os” is indicated on the electrical plans, please note that this is an occupancy sensor
with manual on, automatic off. CA Energy §150.0(k)2I
10. GFI marks still need to be included at bathroom 2 on Sheet E.2. CEC 210.8(A)
11. On the E, P and M sheets, second level bookmark links to lower level plan and lower level
bookmark links to second level plan. Please correct this.
12. Please resubmit the latest version of the structural plans in the next submittal.
For the referenced code information, go to http://www.bsc.ca.gov/Codes.aspx and/or
http://www.sccoplanning.com/PlanningHome/BuildingSafety/BuildingCodes.aspx .
For eplan resubmittal requirements, please see
http://www.sccoplanning.com/PlanningHome/BuildingSafety/ePlanReview.aspx
Please be advised that if plan check comments are required to be addressed leading to a 3rd
plan check, additional charges will be added to your permit fee at an hourly rate.
If you have any questions regarding these building plan check comments, please contact
Laura Mellish at laura.mellish@santacruzcounty.us Review No:3Responses must include an annotated copy of these comments and indicate the specific
sheet/drawing numbers where revisions are located. Text can be copied from the Application
Status webpage and pasted into a text editing program.
Please Respond: Have changes been made in addition to those resulting from the Building
Review Comments? ___________ (Yes or No). If yes, please briefly describe the additional
changes and the location on the plans/documents:
1. Sheet A.2. Deck widths are shown but not the depths. Please add this to the second floor plan
such that the total area of the deck may be determined using the written dimensions.
2. The supplement document index on form PLG-235 marks every item as being provided. Not all
items are provided not applicable. Please revise this form.
3. Please revise specification 14B header to refer to the 2019 California Green Building Code,
rather than the 2016.
4. Please revise specification 14B D to specify maximum flow rate for showerheads to be 1.8 gpm,
rather than 2.0 gpm. Specification 14B E. also an the incorrect flow rate for showerheads.
CALGreen 4.303
5. In the Green Building notes on Sheet A.17, please note a minimum of 65% of the construction
and demolition waste shall be recycled, reused on the project, or salvaged for later use or sale.
CALGreen 4.408.1
6. Where “os” is indicated on the electrical plans, please note that this is an occupancy sensor with
manual on, automatic off. CA Energy §150.0(k)2I
7. GFI marks still need to be included at bathroom 2 on Sheet E.2. CEC 210.8(A)
For the referenced code information, go to http://www.bsc.ca.gov/Codes.aspx and/or
http://www.sccoplanning.com/PlanningHome/BuildingSafety/BuildingCodes.aspx .
For eplan resubmittal requirements, please see
http://www.sccoplanning.com/PlanningHome/BuildingSafety/ePlanReview.aspx
Please be advised that if plan check comments are required to be addressed leading to a 3rd
plan check, additional charges will be added to your permit fee at an hourly rate.
If you have any questions regarding these building plan check comments, please contact
Laura Mellish at laura.mellish@santacruzcounty.us
|