B-232466 / 2023-05-22 / 1st Review by Scott Martini, PE; Stuart England, CASp; Frank Biangone Jr. (MP) Responses must include an annotated copy of these comments and indicate the specific sheet/drawing numbers where revisions are located. Text can be copied from the Application Status webpage and pasted into a text editing program. https://sccounty01.co.santa-cruz.ca.us//PlanningapplicationStatus/ Please Respond: Have changes been made in addition to those resulting from the Building Review Comments? ___________ (Yes or No). If yes, please briefly describe the additional changes and the location on the plans/documents: Please address the following comments:
Note: For the referenced code information, go to http://www.bsc.ca.gov/Codes.aspx and/or http://www.sccoplanning.com/PlanningHome/BuildingSafety/BuildingCodes.aspx. Resubmittal Requirements: 1) “Complete sets” of plans with revisions clouded, labeled, and keyed to a revision date list. 2) Written responses referencing revised sheet(s) and/or detail(s). This plan check list may be copied and responses written below each item. 3) Supplemental documents, as required. Resubmittal Information: http://www.sccoplanning.com/Portals/2/County/Planning/bldg/Re-submittal%20Process%207.21.16.pdf Please be advised that if plan check comments are required to be addressed leading to a 3rd plan check, additional charges will be added to your permit fee at an hourly rate. If you have any questions regarding these building plan check comments, please contact CSG Consultants, Inc. at 888-794-2016, planreview@csgengr.com. B-232466 / 2023-08-31 / 2nd Review by Scott Martini, PE; Stuart England, CASp; Frank Biangone Jr. (MP) Responses must include an annotated copy of these comments and indicate the specific sheet/drawing numbers where revisions are located. Text can be copied from the Application Status webpage and pasted into a text editing program. https://sccounty01.co.santa-cruz.ca.us//PlanningapplicationStatus/ Please Respond: Have changes been made in addition to those resulting from the Building Review Comments? ___________ (Yes or No). If yes, please briefly describe the additional changes and the location on the plans/documents: Please address the following comments: 1. Plans
require approval by the local Environmental Health Department (new restaurant).
Please provide evidence of Health Department plan approval at re-submittal. 2nd Review
Comment: Health Department plan review in process per response. To be verified
prior to final approval. 2. Accessibility
Comment - Sheet A1.0 - Provide accessible dining surfaces in accordance with
CBC 11B-226.1 through 11B-226.3 and an accessible baby diaper changing station
in accordance with 11B-226.4. 2nd Review
Comment: Baby Diaper Changing Table - Scoping section 11B-226.4 requires
compliance with 11B-902. Section 11B-902.2 requires a clear floor space
complying with 11B-305 (30" wide x 48" long) be positioned for a
forward approach. When the table is in the opened position, the toilet will be
in the clear floor space. 3. Accessibility
Comment - Sheet A1.0 - Provide a tactile & Braille exit sign at each exit
door. Provide a detail/detail reference showing full compliance with all
requirements of 2022 CBC 11B-703. Be sure to include the mounting height and
show the signs to be on the latch side of the door in the direction of egress. 2nd
Review Comment: Sheet A1.0 - Provide a tactile & Braille exit sign at each
exit door. Acknowledged response, but this still needs to be added to the plan.
Provide a detail/detail reference showing full compliance with all requirements
of 222 CBC 11B-703. Be sure to include the mounting height and show the signs
to be on the latch side of the door in the direction of egress. 4. Please
provide all components and details of the refrigeration systems on plans. [2022
CMC sec.1101.1] Please show location of refrigeration condensing unit(s)
serving the walk in cooler/freezer on plan. Show floor drains and condensate
drainage on the plumbing plans as applicable. 2nd Review
Comment: Please provide Refrigeration component location on plan or include a
deferred submittal note for the refrigeration systems. 5. Type II hoods shall be installed above
equipment and dishwashers that generate steam, heat, or products of combustion,
and where grease or smoke is not present. [CMC 519.1] 2nd Review
Comment: A commercial dishwasher is shown in the Equipment list but does not
see the dishwasher shown on the ware washing floor plan. If a Dish washer is
installed it must be served by a Type II Exhaust Hood or be listed and approved
to operate without an exhaust hood (UL921). 6. 2nd
Review Comment: Plumbing – Potable water supply to beverage dispensers,
carbonated beverage dispensers, or coffee machines shall be protected by an air
gap or a vented backflow preventer in accordance with ASSE 1022. For carbonated
beverage dispensers, piping material installed downstream of the backflow
preventer shall not be affected by carbon dioxide gas. 2022 CPC sec. 603.5.12. Please
show backflow protection at each beverage dispenser or verify and note if
devices are ASSE 1022 listed/certified. 7. 2nd
Review Comment: Plumbing – Anti-siphon and/or backflow protection is required
at the Icemaker. 2022 CPC sec. 603.1. Please show any proposed Icemakers to be
protected with proper backflow device. 8. 2nd
Review Comment: Plumbing – New/repaired/altered potable water systems are
required to be disinfected by chlorination. 2022 CPC Sec. 609.10 (1, 2, 3, 4).
Please add note to plan. 9. 2nd
Review Comment: Plumbing – Bacteriological testing of potable water system
required to be performed by an independent third-party testing laboratory. 2022
CPC Sec. 609.10(4). Please add note to plan. 10. 2nd Review Comment: Sheet G0.0: Please accurately list all included sheets in the Sheet Index. For example, Sheets G0.2, G0.3, A0.2, A0.3, A1.2 are not listed and Sheet A1.3 is listed but not included. Note: For the referenced code information, go to http://www.bsc.ca.gov/Codes.aspx and/or http://www.sccoplanning.com/PlanningHome/BuildingSafety/BuildingCodes.aspx. Resubmittal Requirements: 1) “Complete sets” of plans with revisions clouded, labeled,
and keyed to a revision date list. 2) Written responses referencing revised sheet(s) and/or
detail(s). This plan check list may be copied and responses written below each item. 3) Supplemental documents, as required. Resubmittal Information: http://www.sccoplanning.com/Portals/2/County/Planning/bldg/Re-submittal%20Process%207.21.16.pdf Please be advised that if plan check comments are required to be addressed leading to a 3rd plan check, additional charges will be added to your permit fee at an hourly rate. If you have any questions regarding these building plan
check comments, please contact CSG Consultants, Inc. at 888-794-2016, planreview@csgengr.com. |