EH Land Use Review

Review No:1

1.      Septic system areas including tanks, leachfield and leachfield expansion area must be fenced off with temporary fencing during construction activities to prevent driving on and disturbance of the soil in these areas. Show this on the following pages: page A1, C1.1, C2.1, C3.1.

No construction materials can be stored on the proposed septic system areas. These areas must remain undisturbed. Disturbance of this area will result in the requirement for a revised septic design in an unaltered area, and additional testing and fees to prove the revised area meets standards.

Review No:2
 
Septic system areas including tanks, leachfield and leachfield expansion area must be fenced off with temporary fencing during construction activities to prevent driving on and disturbance of the soil in these areas. Show the septic system and temporary fencing on the following pages: page A1.


No construction materials can be stored on the proposed septic system areas. These areas must remain undisturbed. Disturbance of this area will result in the requirement for a revised septic design in an unaltered area, and additional testing and fees to prove the revised area meets standards.