Review No:1 B-252501_2025-4-15_1st Review by Bureau Veritas Resubmittals: Please provide a comprehensive resubmittal through the ePlan portal for review. Include an annotated copy of these comments and clearly explain revision locations with sheet/drawing numbers. Identify revisions with clouding and delta markers. Text can be copied/pasted from the Application Status page into text editors. Confirm: Changes have been made in addition to those resulting from review comments? _______ (Yes or No). If yes, briefly describe the changes and locations on the documents: __________________________________________________________________________________________________. Building Review Comments ARCHITECTURAL COMMENTS: [ Russ Sneed – Plans Examiner, CASp 916-514-4504] Russell.sneed@bureauveritas.com A1. Under the code references on the cover sheet, add the CA. Green code and the CA. Energy code. A2. Under the project description on the cover sheet, add the occupant load. A3. Provide a complete accessibility upgrade form. Incorporate any accessibility upgrades into the plan set. A4. On the cover sheet add a note stating any alterations or additions to the fire sprinkler system will require a separate permit. There is a wall being added to the support/break room that may obstruct the fire sprinkler system. A5. The demising walls shown on page A100, are these fire rated assemblies? Provide the fire rating of the walls and add a note stating that the walls shall be maintained/repaired to the existing fire rating. A6. Provide compliance with CBC 11B-805.4.1 for clear floor space at the lounge chairs in the exam rooms. A7. Page A100 on the new floor plan, keynote F23 is called out in work area 115 with an arrow to a receptacle, coordinate the keynotes with the general notes legend. A8. The wall mounted scale #9422-001 on page A102, Does the scale fold up out of the accessible route? GREEN BUILDING COMMENTS: [ Russ Sneed – Plans Examiner, CASp 916-514-4504] Russell.sneed@bureauveritas.com No comments ENERGY COMMENTS: [ Russ Sneed – Plans Examiner, CASp 916-514-4504] Russell.sneed@bureauveritas.com No comments. ELECTRICAL COMMENTS: [Cristian Son –Senior Electrical Plans Examiner - 916 514-4505] Cristian.son@bureauveritas.com. No comments. MECHANICAL COMMENTS: [ Russ Sneed – Plans Examiner, CASp 916-514-4504] Russell.sneed@bureauveritas.com No comments. PLUMBING COMMENTS: [ Russ Sneed – Plans Examiner, CASp 916-514-4504] Russell.sneed@bureauveritas.com No comments. STRUCTURAL COMMENTS: [David Gavranich – ICC Certified Plans Examiner (916) 514-4507] david.gavranich@bureauveritas.com S1. Revise detail P14/A100 to indicate the diameter and minimum embedment length of the powder driven pins used to attach the new light gauge steel studs to the existing concrete slab. CBC 1603.1 Resubmittal Info:Application Status, ePlan User Guide, and ePlan Videos. Reviews: Additional fees are added to permits for comments leading to a 3rd review. Questions:Resubmittals are required for reviews. BuildingReview questions can be emailed to the reviewer’s email address shown above. Indicate permit application number and comment number.
|