Building Review

Review No:1

B-265454_2026-11-17_1st MRS

Revise and harmonize documentation in a comprehensive manner. If not cited below, see CRC R106.1 and/or CBC 107.2.

Building Review Comments

Administrative & Submittal Requirements

1.      Update Master Sheet Index on Cover Sheet S-0: Add Electrical Sheets E1.0 and E2.0 (and E3.0, if provided) to the Sheet Index on Sheet S-0 so it reflects the complete submittal set. CBC § 107.2.1

2.      Resolve Missing Sheet E3.0 on Electrical Drawing Index: Sheet E1.0 lists Sheet E3.0 (Panelboard Schedules & Electrical Specifications) in the Drawing Index and states "Sheet 1 of 3" in the title block, but Sheet E3.0 is missing from the set. Either provide Sheet E3.0 or remove it from the index and update the sheet count. CBC § 107.2.1

3.      Update Applicable Codes List on Cover Sheet S-0: Expand the Applicable Codes list on Sheet S-0 (currently listing only the 2025 CBC) to include the 2025 California Administrative Code, 2025 California Electrical Code, 2025 California Energy Code, 2025 CALGreen, and Santa Cruz County Code. CBC § 107.2.1

4.      Submit ICC-ES Evaluation Reports: Upload current copies of ICC-ES ESR-3889 (DeWalt Screw-Bolt+) and ESR-2713 (Simpson Titen HD) into the Supplemental (SUP) file. CBC § 104.11, § 1705.3

5.      Incorporate Special Inspection Form (PLG-240) onto Plans: Post-installed concrete anchors in Seismic Design Category D require periodic special inspection. Place County Form PLG-240 directly onto the structural plan sheets (do not include it in the SUP file). CBC § 1705.3 / Form PLG-235

Architectural, Accessibility & Exiting

6.      Provide Code Analysis and Exiting Plan: Provide a complete building code analysis on Sheet S-0 and an exiting plan showing occupant load (Mercantile, 60 gross sq. ft./occupant), exit access travel distances, common path of egress travel, and clear aisle widths (minimum 44 inches clear where double-sided display access is provided; minimum 36 inches clear for single-sided accessible aisles). CBC § 1004.5, § 1006, § 1018.4, § 11B-403.5.1

7.      Clarify Demolition and Partition Wall Scope on Plan S-1: Plan S-1 includes fixture-vendor notes stating "RELOCATE DOOR AND ADD WALL," "REMOVE WALLS," "REMOVE COUNTERS, ROLL DOWN GATES, AND OPEN WALL," and "REPURPOSE PHARMACY COUNTERS," which conflict with the Project Narrative on Sheet S-0. Remove these notes if no architectural/demolition work is proposed, or provide architectural plans, framing details, and door clearance dimensions if wall/door modifications are part of this permit. CBC § 107.2.1, § 11B-404

8.      Provide Accessibility Upgrade / Path of Travel Form (PLG-245): Show accessible checkstand counters (36 inches max height, 36 inches min width) and accessible routes to all new display areas, and document Path of Travel compliance (or substantiate an Unreasonable Hardship request on PLG-245 if below the valuation threshold). CBC § 11B-202.4, § 11B-904.3 / Form PLG-245

9.      Verify Accessible Parking (If Applicable): If Path of Travel upgrades apply to parking per Form PLG-245, provide an enlarged accessible parking detail verifying compliant stall dimensions, access aisles, slopes (max 2.08%), and signage. CBC § 11B-208, § 11B-502

Structural

10.   Clarify New vs. Existing-to-Remain Shelving and Provide Hatching Legend on S-1: Clearly distinguish new display shelving and storage racks from existing-to-remain fixtures on Plan S-1, and add a legend defining all hatching patterns and symbols. CBC § 107.2.1

11.   Clarify Wall Types and CMU Wall Attachment Detail (Details 3/S-2 & 4/S-2): Identify which walls receiving display anchorage are wood stud, metal stud, or CMU, and verify that existing partition walls are braced to the roof/ceiling structure above. Additionally, Detail 3/S-2 erroneously references Detail 5/S-2 (Pallet Rack Anchorage) for CMU walls; provide a valid CMU wall attachment detail if CMU walls are present. CBC § 1613 / ASCE 7-22 § 13.3

12.   Clarify Existing Slab Thickness Verification: Sheet S-1 requires a 5-inch minimum concrete slab-on-grade (V.I.F.) to accommodate the 3-1/4" nominal anchor embedment. Clarify how the contractor will verify the existing slab thickness prior to anchor installation and provide an alternate detail if the slab is less than 5 inches thick. CBC § 1905 / ACI 318-19 § 17.5

13.   Reconcile Overstrength Factor (O0) in DeWalt Anchor Calculations (Calc Pages 41 & 60): While O0 = 2.0 was corrected by hand on Calc Pages 11 and 26, Calc Page 41 (Heavy Load Gondola) and Calc Page 60 (Pallet Rack) still list O0 = 2.5 in the DeWalt Design Assist inputs. Update the software runs to use the code-mandated O0 = 2.0 and confirm overstrength is not double-counted in the Pallet Rack calculations. CBC § 1613.1 / ASCE 7-22 Table 13.5-1, Table 15.4-1

14.   Show Permanent Load Plaque Locations on Plan S-1: Indicate on Plan S-1 where the required permanent load plaques (min. 50 sq. in., per Note 1 on S-1) will be posted for field inspection verification. CBC § 107.2.1 / ANSI/MH16.1

15.   Update Code References in Steel Storage Rack Calculations (Calc Page 56): Update the Steel Storage Rack calculations from ASCE 7-16 and ANSI/MH16.1 (2012/2021) to comply with the 2025 CBC, which adopts ASCE 7-22 (§ 15.5.3) and ANSI/MH16.1-2023. CBC § 1613.1, § 2209.1

16.   Verify Pallet Rack Base Plate and Column Dimensions (Detail 5/S-2 & Calc Page 60): Calc Page 60 assumes a 4" x 4" x 1/4" base plate on an HSS 3-1/2" x 2" x 0.125" column with anchors at 2.5" o.c., while Detail 5/S-2 notes "RACK BASE MOUNT PER MANUFACTURER." Submit Lozier manufacturer cut sheets (APR896484A / APR896484S) confirming the actual base plate size, thickness, and bolt pattern match the calculations. CBC § 107.2.1, § 2209.1 / ANSI/MH16.1

17.   Clarify Pallet Rack Configuration and Orthogonal Stability (Calc Pages 56–59): Clarify whether the pallet racks on S-1 are single isolated bays or multi-bay continuous rows, verify seismic stability in the longitudinal direction (in addition to the 4'-0" transverse direction), and confirm the 6" minimum slab edge/cold-joint clearance per Detail 5/S-2. CBC § 1613.1 / ASCE 7-22 § 15.5.3 / ANSI/MH16.1

Electrical

18.   Provide Electrical Engineer Stamp or C-10 Design-Build Certification: Sheets E1.0 and E2.0 are prepared under Triad Electric Inc. (C-10 License #440921) without a California Electrical Engineer stamp or an installing-contractor certification. Either have a California-licensed Electrical Engineer stamp and sign the electrical sheets, or add a signed statement on the plans from Triad Electric Inc. certifying they are the C-10 contractor contracted to install the work (and update the contractor information on Form PLG-200 accordingly). CBC § 107.1 / Cal. Bus. & Prof. Code § 6735, § 6737.3

19.   Provide Panelboard Schedules and Load Calculations (Missing Sheet E3.0): Provide complete panelboard schedules for existing Panels "B" and "EM1" (showing existing loads, new circuit breakers, and wire/conduit sizes) along with updated load calculations confirming adequate capacity on Panels "B," "EM1," and the 400A Main Switchboard ("MSB"). CEC Art. 220, § 408.4

20.   Clarify Emergency Panel "EM1" Classification: Sheet E2.0 connects five new branch circuits (EM1-7 through EM1-11) to Panel "EM1," which is backed up by the 26kW rooftop generator via ATS1. Confirm whether Panel "EM1" is an Article 700 Emergency System or an Article 702 Optional Standby System, as non-emergency retail loads may not be connected to an Article 700 Emergency panel. CEC § 700.15, § 702

21.   Verify Readily Accessible GFCI Protection for High Receptacles: General Note B on E2.0 requires all general 20A, 120V receptacles to be GFCI-protected, and several receptacles are shown at +7'-0" to +9'-0" AFF. Clarify how readily accessible GFCI protection (such as GFCI circuit breakers) will be provided for receptacles mounted above 6'-7" AFF. CEC § 210.8(B), Art. 100

22.   Remove Inapplicable Exterior Sheet Notes on E2.0: Remove Sheet Note 2 ("EXISTING IN-GRADE BOX TO REMAIN") and Sheet Note 3 ("LOCATE ON EXTERIOR BUILDING WALL FOR SIGN LIGHTING") if no exterior or underground work is proposed, or show their locations and provide Title 24, Part 6 outdoor lighting compliance forms if included. CBC § 107.2.1 / CEnC § 130.3

Michael Sotero Certified Plans Examiner - Architect | TEL: 831-454-3249 | michael.sotero@santacruzcountyca.gov